Case Study: Battersea Reach

Main Contractor : St George South London

We have designed, supplied and installed Phases 1 and 2 and are currently working on Phase 3 for this large scale development. Once we completed Phases 1 and 2, the main contractor nominated as us “select provider” for future phases.

All three systems are separate and stand alone. We were responsible for the design, supply and installation of all aspects of the systems. The irrigation systems are essential for this site as the landscaped areas are all on made up ground above a concrete slab, below which is the basement car parking for the developments.

The irrigation system comprises water storage tank, central controller, drip irrigation to planted beds and trees, pop up sprinklers to lawned areas and control valves.

The pump, tank and controller are all installed in plant rooms within the below ground car parking areas. We had to install pipework at high level, penetrate the slab and then install within the landscaped areas. This involved co-ordination with many different trades, including all those with pipework and cabling within the building and the landscaped areas.

Back to News Items List